Multilevel Scheduling of Multistage Production with Limited In-Process Inventory
From MaRDI portal
Publication:3757669
DOI10.2307/2582402zbMATH Open0619.90035OpenAlexW4241290719MaRDI QIDQ3757669FDOQ3757669
Publication date: 1987
Published in: The Journal of the Operational Research Society (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.2307/2582402
Recommendations
- scientific article
- Production scheduling and inventory control for multi-stage manufacturing systems
- Towards a new planning and scheduling approach for multistage production systems
- Terminal inventory level constraints for online production scheduling
- Hierarchical production planning and scheduling in a multi-product, batch process environment
- Optimization on production-inventory problem with multistage and varying demand
- A multi-stage stochastic programming approach in master production scheduling
- Level scheduling of mixed-model assembly lines under storage constraints
- Multiple level production planning in rolling horizon assembly environments
- Hierarchical production planning and scheduling in a multi-product, multi-machine environment
hierarchical schedulingparallel machinesmultilevel programminglimited in-process buffersmultistage, multiproduct production scheduling
Cited In (4)
This page was built for publication: Multilevel Scheduling of Multistage Production with Limited In-Process Inventory
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3757669)