scientific article; zbMATH DE number 4008087

From MaRDI portal
Publication:3758551





[For the entire collection see Zbl 0618.00010.] We use nonlinear programming to build a mathematical model for the optimal dispatch of active power of cascade hydropower stations, and present a new optimality criterion for its short-term economic scheduling in the sense that the potential energy of reservoirs of the cascade be minimum. We have studied the mathematical expressions of the constraints in detail. Using the mixed penalty function method SUMT we transform the constrained nonlinear programming problem into a sequence of unconstrained minimization problems. Then we use the conjugate gradient method CGM to find the search direction and find its optimal step-length by the proportional factor method PFM of linear search. The augmented objective function is defined and the formulas for computing the components of its gradient are derived. We have taken a test computation and analyzing the results and compared them with the original design of an actual cascade hydropower stations, decreasing the water discharge and the water rate of cascade, increasing the generated energy. We have provided several realizable designs for real-time control by computers.











This page was built for publication:

Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3758551)