An Integrated Cost Model for the Joint Optimization of Process Control and Maintenance

From MaRDI portal
Publication:3796948

DOI10.1057/jors.1988.131zbMath0651.90035OpenAlexW2051238639MaRDI QIDQ3796948

George Tagaras

Publication date: 1988

Published in: Journal of the Operational Research Society (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1057/jors.1988.131



Related Items

An extension of Ben-Daya–Rahim (2000) and Rahim–Banerjee (1993) cost models for economic design ofT2-control charts for multivariate deteriorating processes with preventive maintenance and early replacement, Optimal preventive maintenance for equipment with two quality states and general failure time distributions, A generalized version of Ben-Daya-Rahim (2000) and Rahim-Banerjee (1993) cost models in economic design of <ovl>X</ovl>-control charts for systems with early replacement and preventive maintenance under decreasing integrated hazard, An integrated quality and maintenance model for two-unit series systems, Quality control in a single state production system: open and closed loop policies, Integrating on-line process control and imperfect corrective maintenance: an economical design, A condition-based maintenance policy for degrading systems with age- and state-dependent operating cost, An integrated model based on statistical process control and maintenance for two-stage dependent processes, A simulation-based multivariate Bayesian control chart for real time condition-based maintenance of complex systems, Economic and economic-statistical design of a chi-square chart for CBM, Economic design of an integrated adaptive synthetic chart and maintenance management system, An integrated model for economic design of chi-square control chart and maintenance planning, A Bayesian model and numerical algorithm for CBM availability maximization, A New Acceptance Sampling Policy Based on Number of Successive Conforming Items, Optimization of a fully adaptive quality and maintenance model in the presence of multiple location and scale quality shifts, An integrated quality, maintenance and production model based on the delayed monitoring under the ARMA control chart, Effect of maintenance on the economic design of \(\overline x\)-control chart, Joint optimization of \(\overline{X}\) control chart and preventive maintenance policies: a discrete-time Markov chain approach, An optimal production run time with imperfect production processes and allowable shortages, Optimal adaptive control policy for joint machine maintenance and product quality control