Planning Horizon Procedures for Machine Replacement Models

From MaRDI portal
Publication:3853416

DOI10.1287/mnsc.25.2.140zbMath0419.90042OpenAlexW2073738214MaRDI QIDQ3853416

Suresh Chand, Suresh P. Sethi

Publication date: 1979

Published in: Management Science (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1287/mnsc.25.2.140




Related Items

Multiple asset replacement analysis under variable utilization and stochastic demandA parallel machine replacement modelPlanning horizons for capacity expansionA linear programming formulation with integer solutions for solving an equipment replacement problem with multiple assets: the concave demand caseOn the upgrading policy after the redesign of a component for reliability improvementOptimal equipment replacement without paradoxes: A continuous analysisA framework for replacement analysisOptimal replacement of ageing equipment using geometric programmingA survey of dynamic network flowsA model for parallel machine replacement with capacity expansionInfinite horizon optimality criteria for equipment replacement under technological changeNetwork economics and optimal replacement of age-structured IT capitalDiscrete-continuous analysis of optimal equipment replacementCapacity planning with technology replacement by stochastic dynamic programmingForecast horizons and dynamic facility location planningA model for equipment replacement due to technological obsolescenceBoundary value problems in stochastic optimal control of advertisingHybrid approach to the rational management of machine replacementAnticipation echoes in vintage capital modelsDecision and forecast horizons in a stochastic environment: A surveyUnnamed ItemIntegrating equipment investment strategy with maintenance operations under uncertain failuresA paradox in equipment replacement under technological improvement