| Publication | Date of Publication | Type |
|---|
| Structural properties of the lost sales problem with fractional lead times | 2020-02-10 | Paper |
| Lot sizing with learning and forgetting in setups: Analytical results and insights | 2019-05-02 | Paper |
| Production planning with multiple production lines: Forward algorithm and insights on process design for volume flexibility | 2019-03-01 | Paper |
| https://portal.mardi4nfdi.de/entity/Q5506625 | 2016-12-12 | Paper |
| https://portal.mardi4nfdi.de/entity/Q4918967 | 2013-05-07 | Paper |
| Batch sizing under learning and forgetting: Steady state characteristics for the constant demand case | 2008-11-27 | Paper |
| Learning and forgetting effects on a group scheduling problem | 2008-01-21 | Paper |
| Estimating the limits for statistical process control charts: a direct method improving upon the bootstrap | 2007-01-22 | Paper |
| https://portal.mardi4nfdi.de/entity/Q4439066 | 2003-12-10 | Paper |
| The single-item lot-sizing problem with immediate lost sales | 2003-05-19 | Paper |
| A note on optimal allocation of work in stochastic assembly systems | 2002-06-16 | Paper |
| A parallel machine replacement model | 2002-06-11 | Paper |
| The changeover scheduling problem with time and cost considerations: Analytical results and a forward algorithm | 2002-02-07 | Paper |
| A model for parallel machine replacement with capacity expansion | 2000-03-23 | Paper |
| Hall effect on thermal instability of Rivlin-Ericksen fluid | 2000-03-16 | Paper |
| https://portal.mardi4nfdi.de/entity/Q4219979 | 1999-11-03 | Paper |
| A forward branch-and-search algorithm and forecast horizon results for the changeover scheduling problem | 1999-04-27 | Paper |
| Thermosolutal instability of Rivlin-Ericksen rotating fluid in porous medium | 1999-02-16 | Paper |
| The instability of streaming Walters' viscoelastic fluid \(B'\) in porous medium | 1999-01-01 | Paper |
| The instability of streaming Rivlin-Ericksen viscoelastic fluid in porous medium | 1999-01-01 | Paper |
| https://portal.mardi4nfdi.de/entity/Q4949472 | 1999-01-01 | Paper |
| Capacity Allocation for Dynamic Process Improvement with Quality and Demand Considerations | 1998-01-12 | Paper |
| Rolling horizon procedures for the single machine deterministic total completion time scheduling problem with release dates | 1997-12-04 | Paper |
| Single-machine scheduling with dynamic arrivals: Decomposition results and an improved algorithm | 1997-01-21 | Paper |
| An iterative heuristic for the single machine dynamic total completion time scheduling problem | 1996-10-30 | Paper |
| A parts selection model with one-way substitution | 1994-07-26 | Paper |
| https://portal.mardi4nfdi.de/entity/Q4032000 | 1993-05-04 | Paper |
| A Single Machine Model for Determination of Optimal Due Dates and Sequence | 1993-01-16 | Paper |
| Forecast Horizons in the Discounted Dynamic Lot Size Model | 1993-01-16 | Paper |
| Setup cost stability region for the dynamic lot sizing problem with backlogging | 1993-01-16 | Paper |
| https://portal.mardi4nfdi.de/entity/Q3971305 | 1992-06-25 | Paper |
| A Dynamic Lot Sizing Model with Learning in Setups | 1992-06-25 | Paper |
| Existence of Forecast Horizons in Undiscounted Discrete-Time Lot Size Models | 1990-01-01 | Paper |
| Lot sizes and setup frequency with learning in setups and process quality | 1989-01-01 | Paper |
| Single machine scheduling to minimize weighted earliness subject to no tardy jobs | 1988-01-01 | Paper |
| Decision/forecast horizon results for a single facility dynamic location/relocation problem | 1988-01-01 | Paper |
| A Note on "Economic Order Quantity under Conditions of Permissible Delay in Payments" | 1987-01-01 | Paper |
| A note on the single-machine scheduling problem with minimum weighted completion time and maximum allowable tardiness | 1986-01-01 | Paper |
| Minimal forecast horizon procedures for dynamic lot size models | 1986-01-01 | Paper |
| A comparison of average and discounted cost models for the dynamic lot size inventory problem | 1985-01-01 | Paper |
| Rolling Horizon Procedures for the Facilities in Series Inventory Model with Nested Schedules | 1983-01-01 | Paper |
| Finite-production-rate inventory models with first-and second-shift setups | 1983-01-01 | Paper |
| Planning horizon procedures for machine replacement models with several possible replacement alternatives | 1982-01-01 | Paper |
| A Perfect Planning Horizon Procedure for a Deterministic Cash Balance Problem | 1982-01-01 | Paper |
| Lot sizing for products with finite demand horizon and periodic review inventory policy | 1982-01-01 | Paper |
| Multiple Finite Production Rate Dynamic Lot Size Inventory Models | 1981-01-01 | Paper |
| Planning Horizon Procedures for Machine Replacement Models | 1979-01-01 | Paper |