Scheduling coupled tasks
From MaRDI portal
Publication:3892054
DOI10.1002/nav.3800270312zbMath0446.90040MaRDI QIDQ3892054
Publication date: 1980
Published in: Naval Research Logistics Quarterly (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1002/nav.3800270312
90B35: Deterministic scheduling theory in operations research
Related Items
On the complexity of coupled-task scheduling, Scheduling of coupled tasks with unit processing times, Scheduling coupled-operation jobs with exact time-lags, Identical coupled task scheduling: polynomial complexity of the cyclic case, Scheduling of coupled tasks and one-machine no-wait robotic cells, A note on scheduling identical coupled tasks in logarithmic time, Improved analysis of an algorithm for the coupled task problem with UET jobs, Scheduling with neural networks -- the case of the Hubble Space Telescope, Scheduling for a multifunction phased array radar system, Time lag size in multiple operations flow shop scheduling heuristics, Minimizing flowtime for paired tasks, Scheduling coupled tasks with exact delays for minimum total job completion time, Coupled task scheduling with time-dependent processing times, Coupled task scheduling with exact delays: literature review and models, Parameterized complexity of a coupled-task scheduling problem, Two-machine flowshop scheduling problem with coupled-operations, Isomorphic coupled-task scheduling problem with compatibility constraints on a single processor, Coupled task scheduling with convex resource consumption functions, Two machines flow shop with reentrance and exact time lag, Some complexity and approximation results for coupled-tasks scheduling problem according to topology, Coupled-Tasks in Presence of Bipartite Compatibilities Graphs