Scheduling of coupled tasks and one-machine no-wait robotic cells
From MaRDI portal
Publication:954024
DOI10.1016/J.COR.2007.10.003zbMATH Open1157.90406OpenAlexW2052576907MaRDI QIDQ954024FDOQ954024
Authors: Nadia Brauner, Gerd Finke, Vassilissa Lehoux-Lebacque, Jonathan Whitehead, Chris N. Potts
Publication date: 7 November 2008
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://eprints.soton.ac.uk/149855/1/CORCoupledTasksE-Prints.pdf
Recommendations
- Identical coupled task scheduling: polynomial complexity of the cyclic case
- An exact algorithm for scheduling identical coupled tasks
- Scheduling in Robotic Cells: Classification, Two and Three Machine Cells
- Scheduling no-wait robotic cells with two and three machines
- Scheduling of coupled tasks with unit processing times
Cites Work
- A characterization of the minimum cycle mean in a digraph
- Heuristics for a coupled-operation scheduling problem
- Scheduling for a multifunction phased array radar system
- An exact algorithm for scheduling identical coupled tasks
- On the complexity of coupled-task scheduling
- Comparative evaluation of heuristic algorithms for the single machine scheduling problem with two operations per job and time-lags
- Scheduling coupled tasks
Cited In (14)
- New characterizations for the identical coupled tasks scheduling problem
- A binary search algorithm for the general coupled task scheduling problem
- Two-machine flowshop scheduling problem with coupled-operations
- Scheduling of coupled tasks with unit processing times
- Two-phase branch and bound algorithm for robotic cells rescheduling considering limited disturbance
- The coupled task scheduling problem: an improved mathematical program and a new solution algorithm
- The coupled unit-time operations problem on identical parallel machines with respect to the makespan
- Coupled task scheduling with exact delays: literature review and models
- Scheduling a wet station for wafer cleaning with multiple job flows and multiple wafer-handling robots
- Identical coupled task scheduling: polynomial complexity of the cyclic case
- A polynomial algorithm for multi-robot 2-cyclic scheduling in a no-wait robotic cell
- Two machines flow shop with reentrance and exact time lag
- On-line scheduling of a robotic manufacturing cell with stochastic sequence-dependent processing rates
- A genetic algorithm with tabu search procedure for flexible job shop scheduling with transportation constraints and bounded processing times
This page was built for publication: Scheduling of coupled tasks and one-machine no-wait robotic cells
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q954024)