scientific article; zbMATH DE number 3744543
From MaRDI portal
Publication:3929047
Cited in
(14)- First fit decreasing scheduling on uniform multiprocessors
- Scheduling lots of dependent unit-time operations on identical machines to minimize schedule length
- Minimizing expected makespan in a two-machine stochastic open shop with Poisson arrival
- Capacitated two-parallel machines scheduling to minimize sum of job completion times
- Analysis of scheduling problems with typed task systems
- Is a unit-job shop not easier than identical parallel machines?
- On a scheduling problem in a robotized analytical system
- An evolutionary algorithm for the vehicle routing problem with route balancing
- A survey of scheduling with controllable processing times
- Minimizing mean weighted execution time loss on identical and uniform processors
- Minimizing the number of tardy jobs with precedence constraints and agreeable due dates
- `Strong'-`weak' precedence in scheduling: extensions to series-parallel orders
- Scheduling independent 2-processor tasks to minimize schedule length
- Preemptive scheduling to minimize mean weighted flow time
This page was built for publication:
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3929047)