Scheduling independent 2-processor tasks to minimize schedule length
The problem considered in this paper is the deterministic scheduling of tasks on a set of identical processors. However, the model presented differs from the classical one by the requirement that certain tasks need more than one processor at a time for their processing. In the paper an O(n log n) algorithm is given for scheduling n preemtable tasks on m processors to minimize schedule length, when tasks are divided into two subsets. Each task from the first subset requires one processor at a time, and each task from the second subset requires two processors at a time for its processing.
- Characterization of Connection Assignment of Diagnosable Systems
- scientific article; zbMATH DE number 3744543 (Why is no real title available?)
- scientific article; zbMATH DE number 3561065 (Why is no real title available?)
- scientific article; zbMATH DE number 3639144 (Why is no real title available?)
- Optimization of Reduced Dependencies for Synchronous Sequential Machines
- The complexity of scheduling independent two-processor tasks on dedicated processors
- Scheduling multiprocessor tasks -- An overview
- Scheduling multiprocessor tasks with chain constraints
- Two-way dominant sequence clustering for processor scheduling
- Linear and quadratic algorithms for scheduling chains and opposite chains
- Scheduling chained multiprocessor tasks onto large multiprocessor system
- Scheduling of resource tasks
- scientific article; zbMATH DE number 3883925 (Why is no real title available?)
- Scheduling Multiprocessor Tasks to Minimize Schedule Length
- Two processor scheduling with limited preemption
- Scheduling Independent Tasks with Deadlines on Semi-identical Processors
- scientific article; zbMATH DE number 4089308 (Why is no real title available?)
- Scheduling Tree-Structured Tasks on Two Processors to Minimize Schedule Length
- Scheduling independent two processor tasks on a uniform duo-processor system
This page was built for publication: Scheduling independent 2-processor tasks to minimize schedule length
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q796987)