scientific article; zbMATH DE number 63644
From MaRDI portal
Publication:4012987
Recommendations
Cited in
(19)- Decision making algorithm for a class of two-level manufacturing systems
- A loading and dispatching problem in a random flexible manufacturing system
- Scheduling production tasks in a two-stage FMS
- A multilevel machine and vehicle scheduling in a flexible manufacturing system
- Dynamic programming algorithm for a FMS scheduling problem
- Sequencing material handling equipment in production facilities
- Simultaneous loading, routing, and assembly plan selection in a flexible assembly system
- Dispatching algorithm for production programming of flexible job-shop systems in the smart factory industry
- scientific article; zbMATH DE number 1594553 (Why is no real title available?)
- Operation allocation and materials-handling system selection in a flexible manufacturing system: A sequential modelling approach
- Modelling and scheduling of a flexible manufacturing system
- scientific article; zbMATH DE number 744104 (Why is no real title available?)
- A Time Window Approach to Simultaneous Scheduling of Machines and Material Handling System in an FMS
- scientific article; zbMATH DE number 4158349 (Why is no real title available?)
- Vehicle scheduling in two-cycle flexible manufacturing systems
- Routing flexibility and production scheduling in a flexible manufacturing system
- Models and algorithms for job selection, routing, and scheduling in a flexible manufacturing system
- The tool transporter movements problem in flexible manufacturing systems
- A Multi-Fidelity Model Approach for Simultaneous Scheduling of Machines and Vehicles in Flexible Manufacturing Systems
This page was built for publication:
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4012987)