Deterministic Approximations to Co-Production Problems with Service Constraints and Random Yields
From MaRDI portal
Publication:4018316
Recommendations
- Co-Production Processes with Random Yields in the Semiconductor Industry
- A multiperiod stochastic production planning and sourcing problem with service level constraints
- Strategies for the Probabilistic Lot-Sizing Problem with Service-Level Constraints
- Periodic Review Production Models with Variable Capacity, Random Yield, and Uncertain Demand
- Multiple lotsizing with random common-cause yield and rigid demand
Cited in
(14)- Tactical level planning in float glass manufacturing with co-production, random yields and substitutable products
- Managing individual customer service constraints under stochastic demand
- Hierarchical stochastic production planning with delay interaction
- Allocation under a general substitution structure
- Converting retail food waste into by-product
- A single-item lot-sizing problem with a by-product and inventory capacities
- Towards circular economy in production planning: challenges and opportunities
- Service level robustness in stochastic production planning under random machine breakdowns
- Co-Production Processes with Random Yields in the Semiconductor Industry
- Economic lot scheduling with deliberated and controlled coproduction
- On a deterministic approximation of inventory systems with sequential service-level constraints
- A stochastic dynamic programming approach-based yield management with substitution and uncertainty in semiconductor manufacturing
- Implications of coproduction technology on waste management: who can benefit from the coproduct made of leftover materials?
- Stochastic dynamic lot-sizing with supplier-driven substitution and service level constraints
This page was built for publication: Deterministic Approximations to Co-Production Problems with Service Constraints and Random Yields
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4018316)