Tactical level planning in float glass manufacturing with co-production, random yields and substitutable products
From MaRDI portal
Publication:1042132
DOI10.1016/j.ejor.2008.11.024zbMath1176.90387OpenAlexW2005438610MaRDI QIDQ1042132
Z. Caner Taşkın, Ali Tamer Ünal
Publication date: 7 December 2009
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2008.11.024
Related Items (6)
A branch-and-price algorithm for parallel machine campaign planning under sequence dependent family setups and co-production ⋮ Towards circular economy in production planning: challenges and opportunities ⋮ Economic lot scheduling with deliberated and controlled coproduction ⋮ Managing a supply chain under the impact of customer reviews: a two-period game analysis ⋮ A dynamic uncapacitated lot-sizing problem with co-production ⋮ A single-item lot-sizing problem with a by-product and inventory capacities
Cites Work
- A fuzzy linear programming model for production planning in coal mines
- Improved heuristics for sequencing cutting patterns
- A heuristic to schedule flexible job-shop in a glass factory
- Economic lot scheduling with uncontrolled co-production
- Models and algorithms for three-stage two-dimensional bin packing
- An optimization model for trim loss minimization in an automotive glass plant
- Deterministic Approximations to Co-Production Problems with Service Constraints and Random Yields
- Co-Production Processes with Random Yields in the Semiconductor Industry
- A stochastic programming approach for multi-site aggregate production planning
- Robust capacity planning in semiconductor manufacturing
- Integrated capacity, demand, and production planning with subcontracting and overtime options
- Solution of a large-scale two-stage decision and scheduling problem using decomposition
This page was built for publication: Tactical level planning in float glass manufacturing with co-production, random yields and substitutable products