A Branch-and-Bound Algorithm for Two-Stage Production-Sequencing Problems
From MaRDI portal
Publication:4091702
DOI10.1287/OPRE.23.1.118zbMATH Open0326.90031OpenAlexW2151306129MaRDI QIDQ4091702FDOQ4091702
Publication date: 1975
Published in: Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/opre.23.1.118
Numerical mathematical programming methods (65K05) Deterministic scheduling theory in operations research (90B35) Integer programming (90C10)
Cited In (8)
- An approximate solution of the flow-shop problem with sequence dependent setup times
- Flowshop-scheduling problems with makespan criterion: a review
- A MILP model for then-job,M-stage flowshop with sequence dependent set-up times
- On the Modeling Tactics of Research Extensions in Production/Operations Management
- Scheduling under machine breakdown in a continuous process industry
- Impact of sequence-dependent setup time on job shop scheduling performance
- Scheduling in a sequence dependent setup environment with genetic search
- Flowshop scheduling research after five decades
This page was built for publication: A Branch-and-Bound Algorithm for Two-Stage Production-Sequencing Problems
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4091702)