Mathematical Research Data Initiative
Main page
Recent changes
Random page
SPARQL
MaRDI@GitHub
New item
In other projects
MaRDI portal item
Discussion
View source
View history
English
Log in

A Branch-and-Bound Algorithm for Two-Stage Production-Sequencing Problems

From MaRDI portal
Publication:4091702
Jump to:navigation, search

DOI10.1287/OPRE.23.1.118zbMATH Open0326.90031OpenAlexW2151306129MaRDI QIDQ4091702FDOQ4091702

Spencer B. Smith, Ergin Uskup

Publication date: 1975

Published in: Operations Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1287/opre.23.1.118





Mathematics Subject Classification ID

Numerical mathematical programming methods (65K05) Deterministic scheduling theory in operations research (90B35) Integer programming (90C10)



Cited In (8)

  • An approximate solution of the flow-shop problem with sequence dependent setup times
  • Flowshop-scheduling problems with makespan criterion: a review
  • A MILP model for then-job,M-stage flowshop with sequence dependent set-up times
  • On the Modeling Tactics of Research Extensions in Production/Operations Management
  • Scheduling under machine breakdown in a continuous process industry
  • Impact of sequence-dependent setup time on job shop scheduling performance
  • Scheduling in a sequence dependent setup environment with genetic search
  • Flowshop scheduling research after five decades





This page was built for publication: A Branch-and-Bound Algorithm for Two-Stage Production-Sequencing Problems

Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4091702)

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:4091702&oldid=17851324"
Tools
What links here
Related changes
Printable version
Permanent link
Page information
This page was last edited on 6 February 2024, at 06:26. Warning: Page may not contain recent updates.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki