A Branch-and-Bound Algorithm for Two-Stage Production-Sequencing Problems
From MaRDI portal
Publication:4091702
DOI10.1287/opre.23.1.118zbMath0326.90031OpenAlexW2151306129MaRDI QIDQ4091702
Publication date: 1975
Published in: Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/opre.23.1.118
Numerical mathematical programming methods (65K05) Integer programming (90C10) Deterministic scheduling theory in operations research (90B35)
Related Items
On the Modeling Tactics of Research Extensions in Production/Operations Management, Scheduling in a sequence dependent setup environment with genetic search, A MILP model for then-job,M-stage flowshop with sequence dependent set-up times, Impact of sequence-dependent setup time on job shop scheduling performance, An approximate solution of the flow-shop problem with sequence dependent setup times, Scheduling under machine breakdown in a continuous process industry, Flowshop-scheduling problems with makespan criterion: a review, Flowshop scheduling research after five decades