Time-Optimal Control of Resource Allocation in a Complex of Operations Framework
From MaRDI portal
Publication:4104473
DOI10.1109/TSMC.1976.4309456zbMATH Open0336.49022OpenAlexW4251622085MaRDI QIDQ4104473FDOQ4104473
Authors: Jan Węglarz
Publication date: 1976
Published in: IEEE Transactions on Systems, Man, and Cybernetics (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1109/tsmc.1976.4309456
Cited In (13)
- Project scheduling with finite or infinite number of activity processing modes -- a survey
- Mathematical programming formulations for machine scheduling: A survey
- Revenue sharing for resource transfer among projects
- A revised critical path method for networks including both overlap relationships and variable-duration activities
- Total completion time minimization for machine scheduling problem under time windows constraints with jobs' linear processing rate function
- Scheduling preemptable jobs on identical processors under varying availability of an additional continuous resource
- Optimal resource profiles for program scheduling
- Heuristic approaches to discrete-continuous project scheduling problems to minimize the makespan
- Discrete-continuous project scheduling with discounted cash inflows and various payment models -- a review of recent results
- Solving a power-aware scheduling problem by grouping jobs with the same processing characteristic
- On a certain class of power- and energy-related scheduling problems
- Some efficient multi-heuristic procedures for resource-constrained project scheduling
- Optimal control policies for resource allocation in an activity network
This page was built for publication: Time-Optimal Control of Resource Allocation in a Complex of Operations Framework
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4104473)