Time-Optimal Control of Resource Allocation in a Complex of Operations Framework
From MaRDI portal
Publication:4104473
DOI10.1109/TSMC.1976.4309456zbMath0336.49022OpenAlexW4251622085MaRDI QIDQ4104473
Publication date: 1976
Published in: IEEE Transactions on Systems, Man, and Cybernetics (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1109/tsmc.1976.4309456
Related Items
A revised critical path method for networks including both overlap relationships and variable-duration activities, Scheduling preemptable jobs on identical processors under varying availability of an additional continuous resource, Total completion time minimization for machine scheduling problem under time windows constraints with jobs' linear processing rate function, Project scheduling with finite or infinite number of activity processing modes -- a survey, On a certain class of power- and energy-related scheduling problems, Solving a power-aware scheduling problem by grouping jobs with the same processing characteristic, Heuristic approaches to discrete-continuous project scheduling problems to minimize the makespan, Revenue sharing for resource transfer among projects, Some efficient multi-heuristic procedures for resource-constrained project scheduling, Discrete-continuous project scheduling with discounted cash inflows and various payment models -- a review of recent results, Optimal resource profiles for program scheduling, Optimal control policies for resource allocation in an activity network, Mathematical programming formulations for machine scheduling: A survey