Scheduling using drum-buffer-rope in a remanufacturing environment
From MaRDI portal
Publication:4230125
DOI10.1080/00207549608904951zbMath0947.90529OpenAlexW2062356803MaRDI QIDQ4230125
Publication date: 1 March 1999
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207549608904951
Related Items (11)
Economic ordering quantities for recoverable item inventory systems ⋮ Simple heuristics for push and pull remanufacturing policies ⋮ A label correcting algorithm for partial disassembly sequences in the production planning for end-of-life products ⋮ Characteristics of the research on reverse logistics (1995–2005) ⋮ Determination of buffer sizes for drum–buffer–rope (DBR)-controlled production systems ⋮ A GENERALIZED STOCHASTIC PETRI-NET MODEL FOR PERFORMANCE ANALYSIS AND ALLOCATION OPTIMIZATION OF A PARTICULAR REPAIR SYSTEM ⋮ Flexible modelling of correlated operation times with application in product-reuse facilities ⋮ Cyclic lot scheduling with sequence-dependent set-ups: a heuristic for disassembly processes ⋮ End-of-life returns of long-lived products from end customer—insights from an ideally set up closed-loop supply chain ⋮ Modified drum–buffer–rope scheduling mechanism for a non-identical parallel machine flow shop with processing-time variation ⋮ Quantitative models for reverse logistics: A review
Cites Work
This page was built for publication: Scheduling using drum-buffer-rope in a remanufacturing environment