Modified drum–buffer–rope scheduling mechanism for a non-identical parallel machine flow shop with processing-time variation
From MaRDI portal
Publication:5485056
Recommendations
- Formulation and solution of the drum-buffer-rope constraint scheduling problem ( DBRCSP)
- Scheduling using drum-buffer-rope in a remanufacturing environment
- Order review/release and lot splitting in drum-buffer-rope
- A study on the performance of scheduling rules in buffer-constrained dynamic flowshops
- Determination of buffer sizes for drum–buffer–rope (DBR)-controlled production systems
Cites work
- Heuristics for hybrid flow shops with controllable processing times and assignable due dates
- Heuristics for scheduling in a flow shop with multiple processors
- Order review/release and lot splitting in drum-buffer-rope
- Scheduling using drum-buffer-rope in a remanufacturing environment
- Some no-wait shops scheduling problems: Complexity aspect
Cited in
(5)- Determination of buffer sizes for drum–buffer–rope (DBR)-controlled production systems
- A DBR scheduling method for manufacturing environments with bottleneck re-entrant flows
- Bi-level multi-objective mathematical model for job-shop scheduling: the application of theory of constraints
- The hybrid flow shop scheduling problem
- Formulation and solution of the drum-buffer-rope constraint scheduling problem ( DBRCSP)
This page was built for publication: Modified drum–buffer–rope scheduling mechanism for a non-identical parallel machine flow shop with processing-time variation
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5485056)