Modified drum–buffer–rope scheduling mechanism for a non-identical parallel machine flow shop with processing-time variation
From MaRDI portal
Publication:5485056
DOI10.1080/00207540600584805zbMath1094.90564OpenAlexW2059836660MaRDI QIDQ5485056
Publication date: 28 August 2006
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207540600584805
flow shop schedulingtheory of constraintfinite capacity schedulingdrum-buffer-rope (DBR)non-identical parallel machine
Related Items
Bi-level multi-objective mathematical model for job-shop scheduling: the application of Theory of Constraints ⋮ The hybrid flow shop scheduling problem
Cites Work
- Some no-wait shops scheduling problems: Complexity aspect
- Heuristics for hybrid flow shops with controllable processing times and assignable due dates
- Heuristics for scheduling in a flow shop with multiple processors
- Scheduling using drum-buffer-rope in a remanufacturing environment
- Order review/release and lot splitting in drum-buffer-rope