Scheduling research in multiple resource constrained job shops: a review and critique
From MaRDI portal
Publication:4230209
DOI10.1080/00207549608905015zbMath0946.90539OpenAlexW1998010918MaRDI QIDQ4230209
Richard H. Deane, V. B. Gargeya
Publication date: 1 March 1999
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: http://libres.uncg.edu/ir/uncg/f/V_Gargeya_Scheduling_1996.pdf
Related Items
Mass customization in videotape duplication and conversion: challenges of flexible duplication systems, fast delivery, and electronic service, Allocating job-shop manpower to minimize \(L_{\max}\): optimality criteria, search heuristics, and probabilistic quality metrics, An effective lower bound on \(L_{\max}\) in a worker-constrained job shop, Scheduling of design projects with uncertain number of iterations, Resource-constrained project scheduling: A survey of recent developments., Optimal and heuristic solutions for a scheduling problem arising in a foundry, Cross-training workers in Dual Resource Constrained systems with heterogeneous processing times
Cites Work
- Unnamed Item
- Sequencing with Earliness and Tardiness Penalties: A Review
- Production and Sales Planning with Limited Shared Tooling at the Key Operation
- A Review of Production Scheduling
- A Simulation Study of Operating Policies in a Hypothetical Dual-Constrained Job Shop
- A Survey of Scheduling Rules
- A Simulation Study of Predictable Due-Dates
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Queuing with Alternating Priorities
- Two Queues Attended by a Single Server
- The Sequencing Problem
- Review of sequencing research
- Simplified Analysis of an Alternating-Priority Queuing Model with Setup Times