Joint determination of the production lot size and number of shipments for EPQ model with rework
From MaRDI portal
Publication:424031
DOI10.3390/MCA16020317zbMATH Open1238.90008OpenAlexW2187745864MaRDI QIDQ424031FDOQ424031
C. L. Chiu, Chia-Ling Chung, Singa Wang Chiu, Dah-Chuan Gong
Publication date: 30 May 2012
Published in: Mathematical \& Computational Applications (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.3390/mca16020317
Cited In (3)
- Joint determination of the lot size and number of shipments for a family of integrated vendor–buyer systems considering defective products
- Determining optimal price, replenishment lot size and number of shipments for an EPQ model with rework and multiple shipments
- A constrained integrated imperfect manufacturing-inventory system with preventive maintenance and partial backordering
This page was built for publication: Joint determination of the production lot size and number of shipments for EPQ model with rework
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q424031)