Comparing JIT, MRP and TOC, and embedding TOC into MRP
From MaRDI portal
Publication:4245265
DOI10.1080/002075497195597zbMath0953.90513OpenAlexW2046544080MaRDI QIDQ4245265
Publication date: 8 June 1999
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/002075497195597
Related Items (5)
Determination of buffer sizes for drum–buffer–rope (DBR)-controlled production systems ⋮ Queueing network analysis on dynamic lot streaming ⋮ CWIPL II, a mechanism for improving throughput and lead time in unbalanced flow line ⋮ Critical WIP loops: a mechanism for material flow control in flow lines ⋮ Survey-based comparison of performance and change in performance of firms using traditional manufacturing, JIT and TOC
This page was built for publication: Comparing JIT, MRP and TOC, and embedding TOC into MRP