Due-date based loading and scheduling methods for a flexible manufacturing system with an automatic tool transporter
From MaRDI portal
Publication:4245377
DOI10.1080/002075497194255zbMath0943.90519MaRDI QIDQ4245377
Yeong-Dae Kim, Candace Arai Yano
Publication date: 8 June 1999
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/002075497194255
90B30: Production models
Related Items
Loading and scheduling for flexible manufacturing systems with controllable processing times, Two-stage heuristic algorithms for part input sequencing in flexible manufacturing systems, Solving machine-loading problem of a flexible manufacturing system with constraint-based genetic algorithm, Queueing network modelling of flexible manufacturing system using mean value analysis