Minimizing the sum of job earliness and tardiness in a multimachine system
From MaRDI portal
Publication:4245597
DOI10.1080/002075498193192zbMATH Open0940.90504OpenAlexW2132262195MaRDI QIDQ4245597FDOQ4245597
Authors:
Publication date: 19 July 2000
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/002075498193192
Recommendations
- Minimizing the sum of absolute lateness in single-machine and multimachine scheduling
- Minimizing maximum earliness and number of tardy jobs in the single machine scheduling problem
- Minimizing earliness and tardiness subject to total completion time in an identical parallel machine system
- OPTIMAL SINGLE-MACHINE SCHEDULING FOR MINIMIZING THE SUM OF EARLINESS AND TARDINESS PENALTIES
- Minimizing total earliness and tardiness on a single machine using a hybrid heuristic
- A branch-and-bound algorithm to minimise the sum of maximum earliness and tardiness in the single machine
- Minimizing the weighted sum of squared tardiness on a single machine
- Minimizing total tardiness on a single machine with controllable processing times
- Minimization of earliness, tardiness and due date penalties on uniform parallel machines with identical jobs
- Minimizing maximum earliness and number of tardy jobs in the single machine scheduling problem with availability constraint
Cited In (10)
- A multi-phase covering Pareto-optimal front method to multi-objective parallel machine scheduling
- An application of unrelated parallel machine scheduling with sequence-dependent setups at Vestel Electronics
- Multiple machine JIT scheduling: a tabu search approach
- Complexities and algorithms for synchronized scheduling of parallel machine assembly and air transportation in consumer electronics supply chain
- Fixed interval scheduling: models, applications, computational complexity and algorithms
- A survey of scheduling problems with setup times or costs
- Heuristic algorithms for unrelated parallel machine scheduling with a common due date, release dates, and linear earliness and tardiness penalties
- Parallel machine scheduling with preference of machines
- Scheduling Unrelated Parallel Machines with Sequence Dependent Setup Times and Weighted Earliness–Tardiness Minimization
- Parallel machine earliness and tardiness scheduling with proportional weights
This page was built for publication: Minimizing the sum of job earliness and tardiness in a multimachine system
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4245597)