Analysis of Heuristics for Preemptive Parallel Machine Scheduling with Batch Setup Times
From MaRDI portal
Publication:4286476
Recommendations
Cited in
(30)- Scheduling with batching: A review
- Semiconductor manufacturing scheduling of jobs containing multiple orders on identical parallel machines
- Empowering the configuration-IP: new PTAS results for scheduling with setup times
- Bounds on the performance of a heuristic to schedule precedence-related jobs on parallel machines
- Rolling horizon procedures for dynamic parallel machine scheduling with sequence-dependent setup times
- Heuristic scheduling of parallel machines with sequence-dependent set-up times
- Lot-sizing scheduling with batch setup times
- Scheduling with batch setup times and earliness-tardiness penalties
- Resource constrained project scheduling subject to due dates: preemption permitted with penalty
- Parallel machine scheduling with precedence constraints and setup times
- A heuristic for preemptive scheduling with set-up times
- Minimizing flow-time on a single machine with integer batch sizes
- Non-preemptive scheduling on machines with setup times
- Bounds for parallel machine scheduling with predefined parts of jobs and setup time
- scientific article; zbMATH DE number 7559087 (Why is no real title available?)
- Approximation algorithms for two-machine flow shop scheduling with batch setup times
- On the Complexity of Scheduling with Batch Setup Times
- Parallel machine scheduling with splitting jobs
- Approximations and auctions for scheduling batches on related machines
- Machine scheduling with job class setup and delivery considerations
- Two-machine group scheduling problems in discrete parts manufacturing with sequence-dependent setups
- Product grouping for batch processes
- Worst-case error bounds for parallel machine scheduling problems with bounded sequence-dependent setup times
- A Better Heuristic for Preemptive Parallel Machine Scheduling with Batch Setup Times
- Some Heuristics for Scheduling Jobs on Parallel Machines with Setups
- Preemptive parallel-machine scheduling problem of maximizing the number of on-time jobs
- Multi-mode resource-constrained project scheduling problems with non-preemptive activity splitting
- Scheduling batches on parallel machines with major and minor set-ups
- Scheduling preemptive jobs with precedence constraints on parallel machines
- Heuristic methods for the identical parallel machine flowtime problem with set-up times
This page was built for publication: Analysis of Heuristics for Preemptive Parallel Machine Scheduling with Batch Setup Times