An algorithm to minimize total flowtime and maximum job lateness in the two-machine flowshop system
From MaRDI portal
Publication:4354087
Recommendations
Cites work
- scientific article; zbMATH DE number 2146482 (Why is no real title available?)
- Minimising the Maximum Penalty in the Two-Machine Flow Shop
- Minimizing Maximum Lateness in a Two-Machine Open Shop
- Note—Sequencing n Jobs on m Machines to Minimise Maximum Tardiness: A Branch-and-Bound Solution
- Optimal two- and three-stage production schedules with set-up time included
Cited in
(11)- Using two-machine flowshop with maximum lateness objective to model multimedia data objects scheduling problem for WWW applications
- Minimizing the total flow time and the tardiness in a two-machine flow shop
- The two-machine flowshop scheduling problem with total tardiness
- A note on minimizing maximum lateness in a two-machine no-wait flowshop
- Minimizing total flowtime and maximum job lateness in the twomachine flowshop system: a computerized algorithm
- A new sufficient condition of optimality for the two-machine flowshop problem
- Minimising Maximum Lateness in a Two-Machine Flowshop
- Fast algorithms to minimize the makespan or maximum lateness in the two-machine flow shop with release times.
- Minimizing the number of late jobs for the two-machine unit-time job-shop scheduling problem
- An asymptotic two-phase algorithm to minimize total flow time for a two-machine flowshop
- Job lateness in a two-machine flowshop with setup times separated
This page was built for publication: An algorithm to minimize total flowtime and maximum job lateness in the two-machine flowshop system
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4354087)