scientific article; zbMATH DE number 1090467
From MaRDI portal
Publication:4366740
For optimization purposes, maintenance models are developed for two components of the sea-bed protection of the Eastern-Scheldt barrier: (i) the block mats, and (ii) the rock dumping. These models enable optimal maintenance decisions to be determined on the basis of (possibly large) uncertainties in the limiting average rates of deterioration. The modelling assumption that the stochastic processes of scour erosion and rock displacement depend just on limiting averages leads us to regard them as generalized gamma processes. For the entire collection see [Zbl 0863.00050].
Recommendations
Cited in
(4)- Characterizations of scale mixtures of gamma processes in terms of sufficiency and isotropy
- Dynamic optimisation of preventative and corrective maintenance schedules for a large scale urban drainage system
- Time-variant reliability assessment and its sensitivity analysis of cutting tool under invariant machining condition based on Gamma process
- OPTIMAL MAINTENANCE DECISIONS FOR DIKES
This page was built for publication:
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4366740)