Non-identical parallel CNC machine scheduling
From MaRDI portal
Publication:4474693
Recommendations
- Scheduling parallel CNC machines with time/cost trade-off considerations
- Optimal allocation and processing time decisions on non-identical parallel CNC machines: \(\epsilon\)-constraint approach
- Due date and cost-based FMS loading, scheduling and tool management
- Considering manufacturing cost and scheduling performance on a CNC turning machine
- Single CNC machine scheduling with controllable processing times to minimize total weighted tardiness
Cited in
(11)- Job scheduling and management of wearing tools with stochastic tool lifetimes
- Due date and cost-based FMS loading, scheduling and tool management
- A methodology for cutting-tool management through the integration of CAPP and scheduling
- Scheduling of a machining center
- A Lagrangean-based heuristic for multi-plant, multi-item, multi-period capacitated lot-sizing problems with inter-plant transfers
- Parallel machine scheduling with tool loading
- Considering manufacturing cost and scheduling performance on a CNC turning machine
- A part-and-tool assignment method for the workload-balance between machines and the minimisation of tool-shortage occurrences in an FMS
- Optimal allocation and processing time decisions on non-identical parallel CNC machines: \(\epsilon\)-constraint approach
- Scheduling parallel CNC machines with time/cost trade-off considerations
- The general two-level storage management problem: a reconsideration of the KTNS-rule
This page was built for publication: Non-identical parallel CNC machine scheduling
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4474693)