Scheduling parallel CNC machines with time/cost trade-off considerations
From MaRDI portal
Publication:875425
DOI10.1016/j.cor.2005.10.018zbMath1141.90427OpenAlexW2150482375MaRDI QIDQ875425
Publication date: 13 April 2007
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: http://hdl.handle.net/11693/23385
parallel machine schedulingCNC machinestotal completion timecontrollable processing timesmanufacturing cost
Related Items (5)
Minimizing total tardiness and earliness on unrelated parallel machines with controllable processing times ⋮ A survey on offline scheduling with rejection ⋮ A lexicographic optimization approach for a bi-objective parallel-machine scheduling problem minimizing total quality loss and total tardiness ⋮ An intelligent water drop algorithm to identical parallel machine scheduling with controllable processing times: a just-in-time approach ⋮ Complexity analysis of an assignment problem with controllable assignment costs and its applications in scheduling
Uses Software
Cites Work
- Two parallel machine sequencing problems involving controllable job processing times
- Rescheduling of identical parallel machines under machine eligibility constraints.
- Approximation schemes for parallel machine scheduling problems with controllable processing times
- Minimizing the total weighted flow time in a single machine with controllable processing times
- Parallel machine selection and job scheduling to minimize machine cost and job tardiness
- Parallel machine scheduling with a convex resource consumption function
- Multicriteria scheduling
- A new bounding mechanism for the CNC machine scheduling problems with controllable processing times
- Generating efficient schedules for identical parallel machines involving flow-time and tardy jobs
- Some NP-complete problems in quadratic and nonlinear programming
- Choosing the Job Sequence and Processing Times to Minimize Total Processing Plus Flow Cost on a Single Machine
- Minimizing makespan subject to minimum flowtime on two identical parallel machines
- Unnamed Item
- Unnamed Item
This page was built for publication: Scheduling parallel CNC machines with time/cost trade-off considerations