scientific article; zbMATH DE number 1487904
From MaRDI portal
Publication:4494436
Recommendations
- Scheduling a two-stage hybrid flow shop with parallel machines at the first stage
- On scheduling multiple two-stage flowshops
- Two-Stage, Hybrid Flowshop Scheduling Problem
- Heuristic algorithms for multiprocessor task scheduling in a two-stage hybrid flow-shop.
- Two-stage flowshop scheduling problems with identical and batch processors
Cited in
(9)- Preemptive scheduling in a two-stage multiprocessor flow shop is NP-hard
- Scheduling a two-stage hybrid flow shop with parallel machines at the first stage
- Heuristic algorithms for multiprocessor task scheduling in a two-stage hybrid flow-shop.
- Two-machine flow shop scheduling problem with blocking, multi-task flexibility of the first machine, and preemption
- Scheduling two-stage jobs on multiple flowshops
- A two-stage semi-hybrid flowshop problem in graphics processing
- scientific article; zbMATH DE number 5732579 (Why is no real title available?)
- Assignment of jobs to processors in a two-level system
- Analysis of algorithms for two‐stage flowshops with multi‐processor task flexibility
This page was built for publication:
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4494436)