Efficient methods for scheduling make-to-order assemblies under resource, assembly area and part availability constraints
From MaRDI portal
Publication:4496902
DOI10.1080/002075400189653zbMATH Open0945.90513OpenAlexW2147672179MaRDI QIDQ4496902FDOQ4496902
Authors:
Publication date: 21 August 2000
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: http://hdl.handle.net/10419/147579
Recommendations
- scientific article; zbMATH DE number 1820655
- Hierarchical approach to production scheduling in make-to-order assembly
- An ordinal optimization based evolution strategy to schedule complex make-to-order products
- Coordinated production scheduling for make-to-order manufacturing
- A multi‐objective customer orders assignment and resource leveling in make‐to‐order manufacturing
Cited In (10)
- Title not available (Why is that?)
- Deterministic assembly scheduling problems: a review and classification of concurrent-type scheduling models and solution procedures
- Large neighborhood search for an aeronautical assembly line time-constrained scheduling problem with multiple modes and a resource leveling objective
- A lexicographic approach to the robust resource-constrained project scheduling problem
- Supply chain scheduling in a collaborative manufacturing mode: model construction and algorithm design
- Applying available-to-promise (ATP) concept in mixed-model assembly line sequencing problems in a make-to-order (MTO) environment: problem extension, model formulation and Lagrangian relaxation algorithm
- Operator allocation planning for reconfigurable production line in one-of-a-kind production
- Modeling the planning and scheduling across the outsourcing supply chain: a Chaos-based fast Tabu–SA approach
- Time-constrained project scheduling with adjacent resources
- A multi‐objective customer orders assignment and resource leveling in make‐to‐order manufacturing
This page was built for publication: Efficient methods for scheduling make-to-order assemblies under resource, assembly area and part availability constraints
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4496902)