Modelling and optimization of industrial manufacturing processes subject to no-wait constraints
From MaRDI portal
Publication:4497078
DOI10.1080/002075499190671zbMath0949.90563OpenAlexW2124872196MaRDI QIDQ4497078
R. MacChiaroli, S. Riemma, S. Molé
Publication date: 21 August 2000
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/002075499190671
Related Items (12)
A novel timetabling algorithm for a furnace process for semiconductor fabrication with constrained waiting and frequency-based setups ⋮ Feasible insertions in job shop scheduling, short cycles and stable sets ⋮ Large-scale periodic scheduling in time-sensitive networks ⋮ Approximative procedures for no-wait job shop scheduling. ⋮ Two-machine no-wait flowshop scheduling problem with uncertain setup times to minimize maximum lateness ⋮ A better dominance relation and heuristics for two-machine no-wait flowshops with maximum lateness performance measure ⋮ Minimizing total completion time in a two-machine no-wait flowshop with uncertain and bounded setup times ⋮ A survey of scheduling problems with no-wait in process ⋮ No-wait job shop scheduling: tabu search and complexity of subproblems ⋮ An evolutionary approach to rehabilitation patient scheduling: A case study ⋮ An enhanced timetabling procedure for the no-wait job shop problem: a complete local search approach ⋮ Complete local search with limited memory algorithm for no-wait job shops to minimize makespan
This page was built for publication: Modelling and optimization of industrial manufacturing processes subject to no-wait constraints