Lower bounds for the two-machine flow shop problem with time delays
From MaRDI portal
Publication:4596504
Recommendations
- Exact method for the two-machine flow-shop problem with time delays
- Two-machine flow shop scheduling problems with minimal and maximal delays
- The two-machine flowshop scheduling problem with sequence-independent setup times: new lower bounding strategies
- Polynomial lower bounds for the two-machine flowshop problem with sequence-independent setup times
- Minimising makespan in the two-machine flow-shop with release times
Cited in
(5)- Analysis of heuristics for the UET two-machine flow shop problem with time delays
- Exact method for the two-machine flow-shop problem with time delays
- Minimizing makespan in a two-machine flow shop with delays and unit-time operations is NP-hard
- Two-machine flow shop scheduling problems with minimal and maximal delays
- The two-machine flowshop scheduling problem with sequence-independent setup times: new lower bounding strategies
This page was built for publication: Lower bounds for the two-machine flow shop problem with time delays
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4596504)