Integrated network design and scheduling problems with parallel identical machines: Complexity results and dispatching rules

From MaRDI portal
Publication:4642481

DOI10.1002/net.21547zbMath1390.90118OpenAlexW1969076261MaRDI QIDQ4642481

Thomas C. Sharkey, Sarah G. Nurre

Publication date: 23 May 2018

Published in: Networks (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1002/net.21547




Related Items (26)

Incremental network design with shortest pathsInterdependent network restoration: on the value of information-sharingNetwork construction problems with due datesModel and solution method for mean-risk cost-based post-disruption restoration of interdependent critical infrastructure networksScheduling arc shut downs in a network to maximize flow over time with a bounded number of jobs per time periodOnline scheduling problems with flexible release dates: applications to infrastructure restorationDesigning and constructing networks under uncertainty in the construction stage: definition and exact algorithmic approachSolution methodologies for debris removal in disaster responseApplying ranking and selection procedures to long-term mitigation for improved network restorationThe Post-Disaster Debris Clearance Problem Under Incomplete InformationApproximation guarantees of algorithms for fractional optimization problems arising in dispatching rules for INDS problemsNetwork construction/restoration problems: cycles and complexityA linear input dependence model for interdependent networksPolynomial-time approximation schemes for a class of integrated network design and scheduling problems with parallel identical machinesIntegrated reinforcement and repair of interdependent infrastructure networks under disaster-related uncertaintiesIncremental Network Design with Minimum Spanning TreesLateness Minimization in Pairwise Connectivity Restoration ProblemsQuantitative Models for Infrastructure Restoration After Extreme Events: Network Optimization Meets SchedulingApproximating Incremental Combinatorial Optimization ProblemsRisk and resilience-based optimal post-disruption restoration for critical infrastructures under uncertaintyDynamic resource allocation to support oil spill response planning for energy exploration in the ArcticA computational approach to determine damage in infrastructure networks from outage reportsTree optimization based heuristics and metaheuristics in network construction problemsInterdependent integrated network design and scheduling problems with movement of machinesIncremental network design with maximum flowsModeling interdependencies in infrastructure systems using multi-layered network flows




This page was built for publication: Integrated network design and scheduling problems with parallel identical machines: Complexity results and dispatching rules