A two-stage heuristic for disassembly scheduling with assembly product structure
From MaRDI portal
Publication:4661103
DOI10.1057/palgrave.jors.2601690zbMath1095.90048OpenAlexW2081043650MaRDI QIDQ4661103
Publication date: 4 April 2005
Published in: Journal of the Operational Research Society (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1057/palgrave.jors.2601690
Approximation methods and heuristics in mathematical programming (90C59) Stochastic scheduling theory in operations research (90B36)
Related Items (6)
Capacitated disassembly scheduling with random demand ⋮ Heuristics for solving disassemble-to-order problems with stochastic yields ⋮ Stochastic program for disassembly lot-sizing under uncertain component refurbishing lead times ⋮ Towards circular economy in production planning: challenges and opportunities ⋮ On the cooperation of recycling operations ⋮ Disassembly scheduling: literature review and future research directions
This page was built for publication: A two-stage heuristic for disassembly scheduling with assembly product structure