scientific article; zbMATH DE number 2165886
From MaRDI portal
Publication:4675783
Recommendations
- Mixture inventory model in fuzzy demand with controllable lead time
- Optimization of fuzzy integrated inventory model with ordering cost reduction dependent on lead time
- Lot size-reorder point inventory model with fuzzy demands
- Fuzzy mixture inventory model with variable lead-time based on probabilistic fuzzy set and triangular fuzzy number
- Periodic review fuzzy inventory model with variable lead time and fuzzy demand
Cited in
(19)- \((Q,r)\) inventory policies in a fuzzy uncertain supply chain environment
- The further study of safety stock under uncertain environment
- Lot size-reorder point inventory model with fuzzy demands
- On an EOQ model with service level constraint under fuzzy-stochastic demand and variable lead-time
- An interactive method for inventory control with fuzzy lead-time and dynamic demand
- Two-stage fuzzy-AHP model for risk assessment of inventory
- Fuzzy mixture two warehouse inventory model involving fuzzy random variable lead time demand and fuzzy total demand
- EOQ model based on uncertainty theory and inventory risk analysis
- Optimization of multi-part inventory control and production lot under fuzzy uncertainty
- Distribution inventory cost optimization under grey and fuzzy uncertainty
- scientific article; zbMATH DE number 5351471 (Why is no real title available?)
- scientific article; zbMATH DE number 2158951 (Why is no real title available?)
- scientific article; zbMATH DE number 2172630 (Why is no real title available?)
- Periodic review fuzzy inventory model with variable lead time and fuzzy demand
- Mixture inventory model in fuzzy demand with controllable lead time
- Safety factor considerations in fuzzy annual demand inventory model with backorder discount
- Optimization of fuzzy integrated inventory model with ordering cost reduction dependent on lead time
- Fuzzy economic order time models with random demand
- A two-warehouse inventory model with stochastic demand, controllable lead time and fuzzy present value: a technique to deal with arbitrary fuzzy number
This page was built for publication:
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4675783)