An inventory-theory-based inexact multistage stochastic programming model for water resources management
Summary: An inventory-theory-based inexact multistage stochastic programming (IB-IMSP) method is developed for planning water resources systems under uncertainty. The IB-IMSP is based on inexact multistage stochastic programming and inventory theory. The IB-IMSP cannot only effectively handle system uncertainties represented as probability density functions and discrete intervals but also efficiently reflect dynamic features of system conditions under different flow levels within a multistage context. Moreover, it can provide reasonable transferring schemes (i.e., the amount and batch of transferring as well as the corresponding transferring period) associated with various flow scenarios for solving water shortage problems. The applicability of the proposed IB-IMSP is demonstrated by a case study of planning water resources management. The solutions obtained are helpful for decision makers in not only identifying different transferring schemes when the promised water is not met, but also making decisions of water allocation associated with different economic objectives.
- Multistage scenario-based interval-stochastic programming for planning water resources allocation
- An interval-parameter fuzzy two-stage stochastic program for water resources management under uncertainty
- Factorial two-stage stochastic programming for water resources management
- Inexact de Novo programming for water resources systems planning
- ITOM: An interval-parameter two-stage optimization model for stochastic planning of water resources systems
- A finite branch-and-bound algorithm for two-stage stochastic integer programs
- A model for lumpy demand parts in a multi-location inventory system with transshipments
- A multi-stage stochastic integer programming approach for capacity expansion under uncertainty
- A multi-stage stochastic programming approach in master production scheduling
- A pricing model for clearing end-of-season retail inventory
- An interval-parameter fuzzy two-stage stochastic program for water resources management under uncertainty
- An inventory control system for spare parts at a refinery: an empirical comparison of different re-order point methods
- Decomposition and Partitioning Methods for Multistage Stochastic Linear Programs
- Introduction to Stochastic Programming
- Inventory models for perishable items with inventory level dependent demand rate
- Inventory models with ramp type demand rate, partial backlogging and general deterioration rate
- Inventory systems with stochastic demand and supply: properties and approximations
- Parallel decomposition of multistage stochastic programming problems
- Revising the OWA operator for multi criteria decision making problems under uncertainty
- Step decision rules for multistage stochastic programming: a heuristic approach
- Inexact de Novo programming for water resources systems planning
- WARSYP: A robust modeling approach for water resources system planning under uncertainty
- Multistage scenario-based interval-stochastic programming for planning water resources allocation
- Factorial two-stage stochastic programming for water resources management
- An interval-parameter fuzzy two-stage stochastic program for water resources management under uncertainty
- ITOM: An interval-parameter two-stage optimization model for stochastic planning of water resources systems
This page was built for publication: An inventory-theory-based inexact multistage stochastic programming model for water resources management
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q473701)