An inventory-theory-based inexact multistage stochastic programming model for water resources management
DOI10.1155/2013/482095zbMATH Open1299.90238OpenAlexW2024687844WikidataQ59027950 ScholiaQ59027950MaRDI QIDQ473701FDOQ473701
Authors: J. Herrera, Sumit K. Garg
Publication date: 24 November 2014
Published in: Mathematical Problems in Engineering (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1155/2013/482095
Recommendations
- Multistage scenario-based interval-stochastic programming for planning water resources allocation
- An interval-parameter fuzzy two-stage stochastic program for water resources management under uncertainty
- Factorial two-stage stochastic programming for water resources management
- Inexact de Novo programming for water resources systems planning
- ITOM: An interval-parameter two-stage optimization model for stochastic planning of water resources systems
Case-oriented studies in operations research (90B90) Stochastic programming (90C15) Inventory, storage, reservoirs (90B05)
Cites Work
- Step decision rules for multistage stochastic programming: a heuristic approach
- Introduction to Stochastic Programming
- A finite branch-and-bound algorithm for two-stage stochastic integer programs
- A multi-stage stochastic integer programming approach for capacity expansion under uncertainty
- A pricing model for clearing end-of-season retail inventory
- Decomposition and Partitioning Methods for Multistage Stochastic Linear Programs
- Inventory systems with stochastic demand and supply: properties and approximations
- Revising the OWA operator for multi criteria decision making problems under uncertainty
- An inventory control system for spare parts at a refinery: an empirical comparison of different re-order point methods
- An interval-parameter fuzzy two-stage stochastic program for water resources management under uncertainty
- A multi-stage stochastic programming approach in master production scheduling
- A model for lumpy demand parts in a multi-location inventory system with transshipments
- Parallel decomposition of multistage stochastic programming problems
- Inventory models with ramp type demand rate, partial backlogging and general deterioration rate
- Inventory models for perishable items with inventory level dependent demand rate
Cited In (5)
- An interval-parameter fuzzy two-stage stochastic program for water resources management under uncertainty
- Factorial two-stage stochastic programming for water resources management
- ITOM: An interval-parameter two-stage optimization model for stochastic planning of water resources systems
- WARSYP: A robust modeling approach for water resources system planning under uncertainty
- Inexact de Novo programming for water resources systems planning
This page was built for publication: An inventory-theory-based inexact multistage stochastic programming model for water resources management
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q473701)