scientific article; zbMATH DE number 2086930
From MaRDI portal
Publication:4737535
Recommendations
- A PTAS FOR MINIMIZING TOTAL COMPLETION TIME OF BOUNDED BATCH SCHEDULING
- scientific article; zbMATH DE number 2080976
- scientific article; zbMATH DE number 5059917
- A PTAS for the P-batch scheduling with \(p_j=p\) to minimize total weighted completion time
- Minimizing mean completion time in a batch processing system
Cited in
(8)- A PTAS for semiconductor burn-in scheduling
- scientific article; zbMATH DE number 2080976 (Why is no real title available?)
- scientific article; zbMATH DE number 5059917 (Why is no real title available?)
- A PTAS FOR MINIMIZING TOTAL COMPLETION TIME OF BOUNDED BATCH SCHEDULING
- Approximation schemes for minimizing total (weighted) completion time with release dates on a batch machine
- The coordination of transportation and batching scheduling
- A PTAS for the P-batch scheduling with \(p_j=p\) to minimize total weighted completion time
- Designing PTASs for MIN-SUM scheduling problems
This page was built for publication:
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4737535)