Designing PTASs for MIN-SUM scheduling problems
From MaRDI portal
Recommendations
- scientific article; zbMATH DE number 1839470
- scientific article; zbMATH DE number 2102785
- Min-sum scheduling under precedence constraints
- scientific article; zbMATH DE number 2086930
- A PTAS FOR MINIMIZING TOTAL COMPLETION TIME OF BOUNDED BATCH SCHEDULING
- Optimal algorithms and a PTAS for cost-aware scheduling
- A PTAS for minimizing the weighted sum of job completion times on parallel machines
- A PTAS for the P-batch scheduling with \(p_j=p\) to minimize total weighted completion time
- Minimizing completion time for a class of scheduling problems
- FPTAS for half-products minimization with scheduling applications
Cites work
- scientific article; zbMATH DE number 3888913 (Why is no real title available?)
- scientific article; zbMATH DE number 1187164 (Why is no real title available?)
- scientific article; zbMATH DE number 1187165 (Why is no real title available?)
- scientific article; zbMATH DE number 1187167 (Why is no real title available?)
- scientific article; zbMATH DE number 176780 (Why is no real title available?)
- scientific article; zbMATH DE number 1256760 (Why is no real title available?)
- scientific article; zbMATH DE number 1261808 (Why is no real title available?)
- scientific article; zbMATH DE number 1303587 (Why is no real title available?)
- scientific article; zbMATH DE number 1305477 (Why is no real title available?)
- scientific article; zbMATH DE number 1305495 (Why is no real title available?)
- scientific article; zbMATH DE number 1305540 (Why is no real title available?)
- scientific article; zbMATH DE number 1305545 (Why is no real title available?)
- scientific article; zbMATH DE number 1003241 (Why is no real title available?)
- scientific article; zbMATH DE number 1167865 (Why is no real title available?)
- scientific article; zbMATH DE number 1182758 (Why is no real title available?)
- scientific article; zbMATH DE number 2080224 (Why is no real title available?)
- scientific article; zbMATH DE number 1559527 (Why is no real title available?)
- scientific article; zbMATH DE number 1754639 (Why is no real title available?)
- scientific article; zbMATH DE number 1754641 (Why is no real title available?)
- scientific article; zbMATH DE number 1754642 (Why is no real title available?)
- scientific article; zbMATH DE number 1757967 (Why is no real title available?)
- scientific article; zbMATH DE number 1757970 (Why is no real title available?)
- scientific article; zbMATH DE number 1839475 (Why is no real title available?)
- scientific article; zbMATH DE number 871909 (Why is no real title available?)
- scientific article; zbMATH DE number 1405788 (Why is no real title available?)
- scientific article; zbMATH DE number 6472625 (Why is no real title available?)
- scientific article; zbMATH DE number 6472638 (Why is no real title available?)
- A PTAS for minimizing the weighted sum of job completion times on parallel machines
- A PTAS for the average weighted completion time problem on unrelated machines.
- A half-integral linear programming relaxation for scheduling precedence-constrained jobs on a single machine
- Algorithms for Scheduling Independent Tasks
- Algorithms for minimizing weighted flow time
- An algorithm for the single machine sequencing problem with precedence constraints
- Approximation schemes for preemptive weighted flow time
- Bounds for Certain Multiprocessing Anomalies
- Convex quadratic and semidefinite programming relaxations in scheduling
- Decompositions, Network Flows, and a Precedence Constrained Single-Machine Scheduling Problem
- Flowshop and Jobshop Schedules: Complexity and Approximation
- Formulating the single machine sequencing problem with release dates as a mixed integer program
- Minimizing total completion time in two-processor task systems with prespecified processor allocations
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Polynomial time approximation algorithms for machine scheduling: Ten open problems
- Scheduling to Minimize Average Completion Time: Off-Line and On-Line Approximation Algorithms
- Single machine scheduling with release dates
- Structure of a simple scheduling polyhedron
- The power of \(\alpha\)-points in preemptive single machine scheduling.
- Tighter bounds on a heuristic for a partition problem
- Worst Case Bound of an LRF Schedule for the Mean Weighted Flow-Time Problem
Cited in
(5)- scientific article; zbMATH DE number 1839470 (Why is no real title available?)
- Competitive analysis of preemptive single-machine scheduling
- A FPTAS for minimizing total completion time in a single machine time-dependent scheduling problem
- scientific article; zbMATH DE number 1982192 (Why is no real title available?)
- Approximability of average completion time scheduling on unrelated machines
This page was built for publication: Designing PTASs for MIN-SUM scheduling problems
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2489956)