Minimizing completion time for a class of scheduling problems
From MaRDI portal
Publication:794156
Recommendations
Cites work
Cited in
(22)- Jump number problem: The role of matroids
- An algorithm for minimizing setups in precedence constrained scheduling
- Interval orders without odd crowns are defect optimal
- A branch-and-bound algorithm to solve the equal-execution-time job scheduling problem with precedence constraint and profile
- A variant of time minimizing assignment problem
- The setup polyhedron of series-parallel posets
- A class of on-line scheduling algorithms to minimize total completion time
- A greedy algorithm for the solution of the classical NP-hard scheduling problem of minimizing the total delay
- Minimizing task completion time with the execution set method
- Quality of move-optimal schedules for minimizing total weighted completion time
- Designing PTASs for MIN-SUM scheduling problems
- A note on scheduling coupled tasks for minimum total completion time
- TSP race: minimizing completion time in time-sensitive applications
- Reducing the solution space of optimal task scheduling
- scientific article; zbMATH DE number 5723895 (Why is no real title available?)
- scientific article; zbMATH DE number 3906215 (Why is no real title available?)
- Minimizing the Range of Order Completion Times with Multiple Job Classes
- Scheduling with tool changes to minimize total completion time: A study of heuristics and their performance
- scientific article; zbMATH DE number 5059917 (Why is no real title available?)
- Algorithms for minclique scheduling problems
- An heuristic approach for solving OSSP with a objective of minimizing total completion time and resource idleness
- Minimizing setups in ordered sets of fixed width
This page was built for publication: Minimizing completion time for a class of scheduling problems
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q794156)