Joint Vendor-buyer Policy in JIT Manufacturing
From MaRDI portal
Publication:4834261
DOI10.1057/JORS.1995.52zbMATH Open0822.90074OpenAlexW2035850333MaRDI QIDQ4834261FDOQ4834261
Authors: Rotimi S. Aderohunmu, Ayodele Mobolurin, N. A. Bryson
Publication date: 28 May 1995
Published in: The Journal of the Operational Research Society (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1057/jors.1995.52
Recommendations
- Global optimal policy for vendor-buyer integrated inventory system within just in time environment
- Multi-vendor integrated procurement-production system under shared transportation and just-in-time delivery system
- Another look at the single-vendor single-buyer integrated production-inventory problem
- An optimal batch size for integrated production-inventory policy in a supply chain
- A bargaining model with asymmetric information for a single supplier-single buyer problem
Cited In (15)
- Finite horizon planning with fixed-interval deliveries and no shortage
- A vendor managed two-echelon inventory system for an integrated production procurement case
- Setup cost reduction and supply chain coordination in case of asymmetric information
- Multi-vendor integrated procurement-production system under shared transportation and just-in-time delivery system
- Production and delivery policies for enhanced supply chain partnerships
- Impact of Electronic Data Interchange Technology on JIT Shipments
- Finite horizon planning for a production system with permitted shortage and fixed-interval deliveries
- Central versus local multiple stage inventory planning: an analysis of solutions
- An integrated vendor-buyer cooperative inventory model for items with imperfect quality and shortage backordering
- An integrated vendor-buyer inventory model with order-processing cost reduction and permissible delay in payments
- Control and enforcement in order to increase supplier inventory in a JIT contract
- Optimal production plans and shipment schedules in a supply-chain system with multiple suppliers and multiple buyers
- An integrated inventory model under conditions of order processing cost reduction and permissible delay in payments
- Operations planning for a multi-stage kanban system
- Buyer vendor coordination models in supply chain management
This page was built for publication: Joint Vendor-buyer Policy in JIT Manufacturing
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4834261)