Network upgrading problems
From MaRDI portal
Recommendations
Cited in
(19)- To improve the communication delay by upgrading nodes in a continuous version
- Improving spanning trees by upgrading nodes
- The \(p\)-median problem with upgrading of transportation costs and minimum travel time allocation
- Upgrading nodes in tree-shaped hub location
- Upgrading bottleneck constrained forests
- Upgrading edge-disjoint paths in a ring
- Upgrading min-max spanning tree problem under various cost functions
- Upgrading edges in the graphical TSP
- Improving spanning trees by upgrading nodes
- Lagrangian and branch-and-cut approaches for upgrading spanning tree problems
- Upgrading arcs to minimize the maximum travel time in a network
- Up- and downgrading the 1-center in a network
- Optimizing cost flows by edge cost and capacity upgrade
- On the complexity of the upgrading version of the maximal covering location problem
- On budget-constrained flow improvement.
- Upgrading edges in the maximal covering location problem
- Complexity of reducing the delay between two nodes by node-based and edge-based upgrading strategies
- Optimizing budget allocation for center and median points
- Minimizing broadcast costs under edge reductions in tree networks
This page was built for publication: Network upgrading problems
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4861346)