Optimizing cost flows by edge cost and capacity upgrade
DOI10.1016/J.JDA.2004.04.003zbMATH Open1118.90052OpenAlexW2051873362MaRDI QIDQ876725FDOQ876725
Authors: I. Demgensky, Hartmut Noltemeier, H.-C. Wirth
Publication date: 26 April 2007
Published in: Journal of Discrete Algorithms (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.jda.2004.04.003
Recommendations
Programming involving graphs or networks (90C35) Deterministic network models in operations research (90B10) Approximation algorithms (68W25) Transportation, logistics and supply chain management (90B06)
Cites Work
- Title not available (Why is that?)
- Bicriteria Network Design Problems
- Network upgrading problems
- Title not available (Why is that?)
- Title not available (Why is that?)
- Many birds with one stone
- The network inhibition problem
- Modifying edges of a network to obtain short subgraphs
- Improving spanning trees by upgrading nodes
- Upgrading bottleneck constrained forests
Cited In (7)
- Budget-constrained minimum cost flows
- Title not available (Why is that?)
- A linear time algorithm for a variant of the MAX CUT problem in series parallel graphs
- On the flow cost lowering problem
- Robust flows with losses and improvability in evacuation planning
- Title not available (Why is that?)
- On budget-constrained flow improvement.
This page was built for publication: Optimizing cost flows by edge cost and capacity upgrade
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q876725)