A Heuristic for a Resource-capacitated Multi-stage Lot-sizing Problem with Lead Times
From MaRDI portal
Publication:4864349
DOI10.1057/jors.1995.169zbMath0845.90038OpenAlexW2018980801MaRDI QIDQ4864349
Alistair Richard Clark, Vinicius Amaral Armentano
Publication date: 15 September 1996
Published in: Journal of the Operational Research Society (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1057/jors.1995.169
Related Items (max. 100)
Dynamic capacitated lot-sizing problems: a classification and review of solution approaches ⋮ Meta-heuristics for dynamic lot sizing: a review and comparison of solution approaches ⋮ METAHEURISTIC APPROACHES FOR THE MULTILEVEL RESOURCE-CONSTRAINED LOT-SIZING PROBLEM WITH SETUP AND LEAD TIMES ⋮ A heuristic method for lot-sizing in multi-stage systems ⋮ Reformulations of the shortest route model for dynamic multi-item multi-level capacitated lotsizing ⋮ Production planning with load dependent lead times: An update of research ⋮ Solving uncapacitated multilevel lot-sizing problems using a particle swarm optimization with flexible inertial weight ⋮ Calculating safety stocks for assembly systems with random component procurement lead times: a branch and bound algorithm ⋮ Heuristic genetic algorithms for general capacitated lot-sizing problems
This page was built for publication: A Heuristic for a Resource-capacitated Multi-stage Lot-sizing Problem with Lead Times