Multi-level multi-item lot size planning with limited resources and general manufacturing structure.
From MaRDI portal
(Redirected from Publication:684381)
Recommendations
- A Lagrangean-Based Heuristic for Dynamic Multilevel Multiitem Constrained Lotsizing with Setup Times
- Multilevel Lot Sizing with Setup Times and Multiple Constrained Resources: Internally Rolling Schedules with Lot-Sizing Windows
- A heuristic for dynamic multi-item multi-level capacitated lotsizing for general product structures
- A Heuristic for a Resource-capacitated Multi-stage Lot-sizing Problem with Lead Times
- Lot sizing in general assembly systems with setup costs, setup times, and multiple constrained resources
Cites work
- scientific article; zbMATH DE number 193411 (Why is no real title available?)
- scientific article; zbMATH DE number 3529629 (Why is no real title available?)
- A Lagrangean Relaxation Approach for Very-Large-Scale Capacitated Lot-Sizing
- A Simple Forward Algorithm to Solve General Dynamic Lot Sizing Models with n Periods in 0(n log n) or 0(n) Time
- A Survey of Lagrangean Techniques for Discrete Optimization
- A heuristic for dynamic multi-item multi-level capacitated lotsizing for general product structures
- A simple heuristic for the multi-item single level capacitated lotsizing problem
- Analysis Of Lagrangian Decomposition For The Multi-Item Capacitated Lot-Sizing Problem
- Analysis of relaxations for the multi-item capacitated lot-sizing problem
- Comparative analysis of lot-sizing models for multi-stage systems: a simulation study
- Deterministic lotsizing models for production planning
- Economic Lot Sizing: An O(n log n) Algorithm That Runs in Linear Time in the Wagner-Whitin Case
- Multilevel capacitated lotsizing complexity and LP-based heuristics
- Primal-dual approach to the single level capacitated lot-sizing problem
- The Lagrangian Relaxation Method for Solving Integer Programming Problems
- The discrete lot-sizing and scheduling problem
- Validation of subgradient optimization
Cited in
(27)- A MAX-MIN ant system for unconstrained multi-level lot-sizing problems
- Reformulations of the shortest route model for dynamic multi-item multi-level capacitated lotsizing
- Randomized multi-level lot-sizing heuristics for general product structures.
- Lot sizing in general assembly systems with setup costs, setup times, and multiple constrained resources
- Lot Sizing in Serial Assembly Systems with Multiple Constrained Resources
- A two-level planning procedure with respect to make-or-buy decisions, including cost allocations
- METAHEURISTIC APPROACHES FOR THE MULTILEVEL RESOURCE-CONSTRAINED LOT-SIZING PROBLEM WITH SETUP AND LEAD TIMES
- scientific article; zbMATH DE number 1050884 (Why is no real title available?)
- Hierarchically integrated lot size optimization
- A heuristic approach for big bucket multi-level production planning problems
- Multilevel capacitated lot-sizing and resource-constrained project scheduling: an integrating perspective
- Optimal Lot-Sizing Algorithms for Complex Product Structures
- Mixed integer programming model formulations for dynamic multi-item multi-level capacitated lotsizing
- Combining items for lot sizing in multi-level assembly systems
- Improved heuristic methods for multiple stage production planning.
- Analysis of production control systems kanban and CONWIP
- Competitive methods for multi-level lot sizing and scheduling: tabu search and randomized regrets
- Dynamic capacitated lot-sizing problems: a classification and review of solution approaches
- Incorporating kin selection in simulated annealing algorithm and its performance evaluation
- Lot sizing in capacitated production planning and control systems
- Multi-level, single-machine lot sizing and scheduling (with initial inventory)
- Multilevel Lot Sizing with Setup Times and Multiple Constrained Resources: Internally Rolling Schedules with Lot-Sizing Windows
- Heuristics for Multilevel Lot-Sizing with a Bottleneck
- scientific article; zbMATH DE number 1859369 (Why is no real title available?)
- A capacity-oriented hierarchical approach to single-item and small-batch production planning using project-scheduling methods
- Lead time considerations for the multi-level capacitated lot-sizing problem
- A Heuristic for a Resource-capacitated Multi-stage Lot-sizing Problem with Lead Times
This page was built for publication: Multi-level multi-item lot size planning with limited resources and general manufacturing structure.
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q684381)