Lot Sizing in Serial Assembly Systems with Multiple Constrained Resources
From MaRDI portal
DOI10.1287/MNSC.42.1.19zbMATH Open0851.90054OpenAlexW2074933211MaRDI QIDQ4887771FDOQ4887771
Terry P. Harrison, Holly S. Lewis
Publication date: 25 November 1996
Published in: Management Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/mnsc.42.1.19
heuristiclot sizingserial assembly systemscoefficient modification heuristicmultiple constrained resourcesreal printed circuit board manufacturing situation
Cited In (15)
- Finite horizon planning with fixed-interval deliveries and no shortage
- Optimizing the allocation of components to kits in small-lot, multiechelon assembly systems
- Reducing the cost of defects in multistage production systems: A budget allocation perspective
- Heuristic algorithms for dynamic capacitated lotsizing for production flow networks with setup times
- An Improved Algorithm for Finding Optimal Lot Sizing Policies for Finite Production Rate Assembly Systems
- METAHEURISTIC APPROACHES FOR THE MULTILEVEL RESOURCE-CONSTRAINED LOT-SIZING PROBLEM WITH SETUP AND LEAD TIMES
- Production lot sizing in failure prone two-stage serial systems
- Aggregation of Resource Constraints for Groups of Similar Components in Manufacturing Systems
- Lagrangean relaxation based heuristics for lot sizing with setup times
- Meta-heuristics for dynamic lot sizing: a review and comparison of solution approaches
- Optimal production plans and shipment schedules in a supply-chain system with multiple suppliers and multiple buyers
- Lot sizing in general assembly systems with setup costs, setup times, and multiple constrained resources
- Dynamic capacitated lot-sizing problems: a classification and review of solution approaches
- Multiple level production planning in rolling horizon assembly environments
- Scheduling injection molding operations with multiple resource constraints and sequence dependent setup times and costs
Recommendations
- Lot sizing in general assembly systems with setup costs, setup times, and multiple constrained resources π π
- Multi-level multi-item lot size planning with limited resources and general manufacturing structure. π π
- Multilevel Lot Sizing with Setup Times and Multiple Constrained Resources: Internally Rolling Schedules with Lot-Sizing Windows π π
- A heuristic method for lot-sizing in multi-stage systems π π
- Lot Sizing Policies for Finite Production Rate Assembly Systems π π
This page was built for publication: Lot Sizing in Serial Assembly Systems with Multiple Constrained Resources
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4887771)