scientific article; zbMATH DE number 1446120
This paper is one of a series of essays in Honour of Franz Ferschl's 70th Birthday. It fixes that M/M/1 queuing model and Karmarkar's approach do not match. This result follows because the assumptions that the arrival of batches is related with a Poisson distribution and that the completion time is an exponential random variable are not acceptable. The inconsistencies are removed. The author removes the second assumption and introduces the independence for set up and processing time. The expectation \(T\) of the time a lot spends in the system is calculated and its relation with lot size is analysed. The overestimation of \(T\) by Karmarkar's approach is obtained. A similar procedure is applied to the processing time of a batch. The analysis of the time between the release of two batches is studied and corresponding means and variances are derived . For the entire collection see [Zbl 0930.00096].
- A lot sizing model with queueing delays: The issue of safety time
- A general approximation for the single product lot sizing model with queueing delays
- Flow Time Distributions In Queues With Customer Batching And Setup Times
- Note—Lot-Sizing and Sequencing Delays
- Lot Sizes, Lead Times and In-Process Inventories
This page was built for publication:
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4953795)