scientific article; zbMATH DE number 1446121
This paper is one of a series of essays in honour of Franz Ferschl's 70th Birthday. The authors study the coordination in a single stage system. The problem is the co-ordination for Material Requirement Planning (MRP)policies. The case of external returns is studied. The critical run-out time (for excess returns), the control of inventory levels, the re-manufacturing rule, the projected total requirements for a time span and other parameters are derived for the cases of external and internal returns. Their combinations with reactive and proactive planning are reported. Three schemes are used for illustrating the production/re-manufacturing systems analysed. Control rules for establishing deterministic decision making procedures are developed. They propose a procedure which controls the production of re-manufacturing processes in a single stage of a system . Their structure is similar to an optimal stochastic control rule. For the entire collection see [Zbl 0930.00096].
- Performance of MRP in product recovery systems with demand, return and leadtime uncertainties
- Planning stability in material requirements planning systems
- Multi-level production-inventory control: Material requirements planning or reorder point policies?
- Production planning and inventory control with remanufacturing and disposal
- Optimal Policy for a Multiechelon Inventory System with Remanufacturing
- Computational issues in a stochastic finite horizon one product recovery inventory model
- Performance of MRP in product recovery systems with demand, return and leadtime uncertainties
- Planning stability in material requirements planning systems
- Modeling reverse logistic tasks within closed-loop supply chains: an example from the automotive industry
This page was built for publication:
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4953796)