An efficient approach of designing distribution-free exponentially weighted moving average schemes with dynamic fast initial response for joint monitoring of location and scale
From MaRDI portal
Publication:5033424
Cites work
- scientific article; zbMATH DE number 4001209 (Why is no real title available?)
- scientific article; zbMATH DE number 7142725 (Why is no real title available?)
- A combination of Wilcoxon's and Ansari-Bradley's statistics
- A rule of thumb for testing symmetry about an unknown median against a long right tail
- Applying fast initial response features on GWMA control charts for monitoring autocorrelation data
- Distribution-Free Quality Control Charts Based on Signed-Rank-Like Statistics
- Distribution-free exceedance CUSUM control charts for location
- Distribution-free monitoring of univariate processes
- Fast initial response features for EWMA control charts
- Improved CUSUM charts for monitoring process mean
- Nonparametric simultaneous tests for location and scale testing: a comparison of several methods
- Nonparametric statistical process control
- Nonparametric statistical tests. A computational approach.
- On increasing the sensitivity of mixed EWMA-CUSUM control charts for location parameter
- Optimal design of Shewhart-Lepage type schemes and its application in monitoring service quality
- Optimizing joint location-scale monitoring -- an adaptive distribution-free approach with minimal loss of information
- Some notes on the location–scale Cucconi test
- The run sum R chart with fast initial response
Cited in
(6)- Distribution-free Phase II triple EWMA control chart for joint monitoring the process location and scale parameters
- A comprehensive distribution-free scheme for tri-aspect surveillance of complex processes
- Optimal Surveillance Based on Exponentially Weighted Moving Averages
- A comparative study on the nonparametric memory-type charts for monitoring process location
- Weighted moving averages: an efficient plan for monitoring specific location shifts
- Distribution-free mixed GWMA-CUSUM and CUSUM-GWMA Mann–Whitney charts to monitor unknown shifts in the process location
This page was built for publication: An efficient approach of designing distribution-free exponentially weighted moving average schemes with dynamic fast initial response for joint monitoring of location and scale
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5033424)