Outsourcing and scheduling for a two-machine flow shop with release times
From MaRDI portal
Publication:5058745
DOI10.1080/0305215X.2017.1325483MaRDI QIDQ5058745FDOQ5058745
Authors: Fardin Ahmadizar, Z. Amiri
Publication date: 23 December 2022
Published in: Engineering Optimization (Search for Journal in Brave)
Recommendations
- Outsourcing and scheduling for two-machine ordered flow shop scheduling problems
- Scheduling of two-machine flowshop with outsourcing lead-time
- Two-machine flow shop scheduling problem with an outsourcing option
- Two-machine flow shop scheduling with limited cost of outsourcing
- Two-machine open-shop scheduling with outsourcing
- Approximation algorithms for two-machine flow shop scheduling with an outsourcing option
- Outsourcing decisions in \(m\)-machine permutation flow shop scheduling problems with machine-dependent processing times
- Minimising makespan in the two-machine flow-shop with release times
- On two-machine flow shop scheduling
- Minimizing makespan in a two-machine flowshop scheduling with batching and release time
Cites Work
- Ant colony optimization.
- Title not available (Why is that?)
- New results on two-machine flow-shop scheduling with rejection
- Two-machine flow shop scheduling problem with an outsourcing option
- Outsourcing and scheduling for two-machine ordered flow shop scheduling problems
- Two-stage production scheduling with an outsourcing option
- A Branch-and-Bound Approach for a Two-machine Flowshop Scheduling Problem
- Minimising makespan in the two-machine flow-shop with release times
- Analysis of Heuristics for Two-Machine Flow-Shop Sequencing Subject to Release Dates
- An ant colony optimization approach to a permutational flowshop scheduling problem with outsourcing allowed
- Single machine scheduling problems with subcontracting options
- Scheduling with an outsourcing option on both manufacturer and subcontractors
Cited In (6)
- Optimization of processing and delivery decisions involving third-party machines
- Permutation flowshop scheduling with simple linear deterioration
- Group scheduling with deteriorating jobs and allotted resource under limited resource availability constraint
- Flow Shop Resource Allocation Scheduling with Due Date Assignment, Learning Effect and Position-Dependent Weights
- A two-stage flow-shop scheduling problem with incompatible job families and limited waiting time
- Common due date assignment scheduling for a no-wait flowshop with convex resource allocation and learning effect
This page was built for publication: Outsourcing and scheduling for a two-machine flow shop with release times
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5058745)