Statistical process control (SPC) for short production run with Cauchy distribution, a case study with corrected numbers approach
From MaRDI portal
Publication:5085618
Cites work
- A simple general approach to inference about the tail of a distribution
- CONTINUOUS INSPECTION SCHEMES
- Control chart for autocorrelated processes with heavy tailed distributions
- Determination of A. R. L. and a Contour Nomogram for Cusum Charts to Control Normal Mean
- scientific article; zbMATH DE number 3947305 (Why is no real title available?)
- scientific article; zbMATH DE number 1146587 (Why is no real title available?)
- scientific article; zbMATH DE number 3223982 (Why is no real title available?)
- Run length, average run length and false alarm rate of shewhart x-bar chart: exact derivations by conditioning
- Statistical quality control. A modern introduction
- The effect of autocorrelation on the retrospectiveX-chart
This page was built for publication: Statistical process control (SPC) for short production run with Cauchy distribution, a case study with corrected numbers approach
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5085618)