Impact of finite buffers on the optimal scheduling of a single-machine two-part-type manufacturing system
From MaRDI portal
Publication:5267053
DOI10.1109/TAC.2002.803540zbMATH Open1364.90162OpenAlexW2145460502MaRDI QIDQ5267053FDOQ5267053
Francesco Martinelli, P. Valigi
Publication date: 20 June 2017
Published in: IEEE Transactions on Automatic Control (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1109/tac.2002.803540
Cited In (1)
Recommendations
- Batch scheduling in a two-machine flow shop with limited buffer π π
- Title not available (Why is that?) π π
- Complexity of scheduling problem in single-machine flexible manufacturing system with cyclic transportation and unlimited buffers π π
- A two-machine permutation flow shop scheduling problem with buffers π π
- Batch scheduling in a two-machine flow shop with limited buffer and sequence independent setup times and removal times. π π
- ON AN AUTOMATED TWO-MACHINE FLOWSHOP SCHEDULING PROBLEM WITH INFINITE BUFFER π π
- Optimal feedback controls in deterministic two-machine flowshops with finite buffers π π
- An exact algorithm for the batch sequencing problem in a two-machine flow shop with limited buffer π π
- On permutation schedules for two-machine flow shops with buffer constraints and constant processing times on one machine π π
- Mathematical formulations for scheduling in manufacturing cells with limited capacity buffers π π
This page was built for publication: Impact of finite buffers on the optimal scheduling of a single-machine two-part-type manufacturing system
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5267053)