Impact of finite buffers on the optimal scheduling of a single-machine two-part-type manufacturing system
From MaRDI portal
Publication:5267053
Recommendations
- Batch scheduling in a two-machine flow shop with limited buffer
- scientific article; zbMATH DE number 764416
- Complexity of scheduling problem in single-machine flexible manufacturing system with cyclic transportation and unlimited buffers
- A two-machine permutation flow shop scheduling problem with buffers
- Batch scheduling in a two-machine flow shop with limited buffer and sequence independent setup times and removal times.
- ON AN AUTOMATED TWO-MACHINE FLOWSHOP SCHEDULING PROBLEM WITH INFINITE BUFFER
- Optimal feedback controls in deterministic two-machine flowshops with finite buffers
- An exact algorithm for the batch sequencing problem in a two-machine flow shop with limited buffer
- On permutation schedules for two-machine flow shops with buffer constraints and constant processing times on one machine
- Mathematical formulations for scheduling in manufacturing cells with limited capacity buffers
Cited in
(1)
This page was built for publication: Impact of finite buffers on the optimal scheduling of a single-machine two-part-type manufacturing system
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5267053)