Solving the batch scheduling problem with family setup times
From MaRDI portal
Publication:5392000
DOI10.1007/978-3-642-00142-0_19zbMATH Open1209.90161OpenAlexW2224706127MaRDI QIDQ5392000FDOQ5392000
Publication date: 7 April 2011
Published in: Operations Research Proceedings 2008 (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/978-3-642-00142-0_19
Recommendations
- Family scheduling with batch availability in flow shops to minimize makespan
- Flow shop batching and scheduling with sequence-dependent setup times
- Solving the serial batching problem in job shop manufacturing systems
- A sequencing problem with family setup times
- Flow-shop batch scheduling with identical processing-time jobs
Cited In (4)
- Impact of family-based scheduling on transfer batches in a job shop manufacturing cell
- Scheduling batches on parallel machines with major and minor set-ups
- Single machine batch scheduling problem with family setup times and release dates to minimize makespan
- Scheduling with product family set-up times: an application in TFT LCD manufacturing
This page was built for publication: Solving the batch scheduling problem with family setup times
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5392000)